Signup Sample Report


Signup for a free 7 Day account and view Marcellus, Utica, Eagle Ford, and Antrim shale map layers in Pennsylvania, Ohio, West Virginia, Texas, and Michigan. Subscribe to view recent Lease Offers and Available Property, and additional pipeline layers. Click the Free Signup to get started, no software downloads required! (Firefox is recommended Browser)

Recent Maps


EQT Wetzel Co WV Permit Location 02-2016


Chesapeake Jefferson Co OH 12 2015 Permit.Pipeline


Gulfport Belmont Permit Location 11-24-2015


11-2015 Gulfport Belmont Co Permit


XTO Belmont Co Permit Loc w/Pipelines

How to identify wells subject to state mandatory integration orders

Mandatory integration orders, also called compulsory pooling or forced pooling orders, let a regulator require separate landowners to combine their interests for a shale well. An order may determine who may drill, the acreage covered, and how drilling costs and production are shared. Identifying an affected well is legal research as much as map analysis.

A reliable answer comes from the final state commission record rather than the well's proximity to a shale play. A permit, lease, or pipeline layer can narrow the search, but only the order and supporting filings show whether a particular well was authorised through mandatory integration. The workflow below connects the legal record with well and mineral-rights data.

Understand what mandatory integration does

Mandatory integration usually arises when an operator proposes a well across separately owned tracts and the owners have not agreed to pool their interests. Depending on state law, the commission may approve a reduced spacing exception, compulsory pooling, or another integration mechanism so the well can proceed without duplicative drilling or wasted resources.

The legal effect extends beyond a voluntary lease arrangement. The operator may receive authority to use the pooled acreage, charge certain owners their proportionate drilling costs, and allocate production according to the order. Some orders also specify royalty deductions or require the operator to maintain accounting records.

Integration is not the same as unitization. Integration commonly concerns separate ownership interests needed for one drilling project, while unitization generally combines production from different wells or reservoirs for joint management. A file labelled “unitization” should therefore be reviewed separately rather than treated as proof of compulsory pooling.

Start with the governing state and agency

Begin with the state in which the proposed well and leased acreage sit, not the state where an investor, operator, or landowner is headquartered. The relevant regulator might be a railroad or oil and gas commission, a public utilities commission, a conservation department, or another state body. Texas, North Dakota, Pennsylvania, Ohio, Oklahoma, New Mexico, and Colorado each use distinct statutes, forms, and terminology.

State variation matters because some jurisdictions provide broad compulsory-pooling authority, while others permit pooling only in limited circumstances or rely more heavily on voluntary agreements. A generic United States layer can identify likely candidates, but it cannot replace the governing state's enabling statute, commission rules, or case decisions.

For spatial orientation, start with the Shale Navigator map and filter permits, leases, mineral rights, and property data by state. Treat the map as an investigative index: use it to identify the operator, counties, and candidate tracts before retrieving the legal order. This mirrors Australia's federal and state structure, where an onshore petroleum law adopted in Queensland differs from the regime applying in Victoria.

Find the controlling commission record

Search the regulator's docket system using the operator, proposed well name, county, and several legal terms. “Mandatory integration,” “compulsory pooling,” “forced pooling,” “pooling order,” and “integration order” may appear in related documents. Include nearby docket numbers because agencies sometimes index an application under a lease or operator rather than the eventual well name.

Distinguish an application from the decision that governs. A public file may contain a petition, hearing notices, objections, testimony, draft orders, and a final order. Confirm the document status, effective date, and any appeal, rehearing, stay, amendment, or vacation. A proposed well may also have been replaced by a substitute well or supplemented by later wells under the same pooling arrangement.

Operator websites and county records can help locate the proceeding, but the commission docket should remain the primary source. Legal repositories may reproduce the order or its exhibits, while land and mineral-rights databases can help identify the affected tracts. Save a dated copy of the source rather than relying on a search-result snippet or an unverified summary.

Match the order to well and lease records

A final order may use legal descriptions that do not immediately resemble the identifiers shown on a drilling permit. Reconcile several layers before deciding that a completed well was subject to mandatory integration.

Core records to reconcile

  • Proposed or substitute well name, operator, well type, and drilling direction
  • API well identifier or state permit number
  • County, township, section, survey, and tract identifiers
  • Pooling or unit name, if one appears in the order
  • Order date, effective period, and later amendments

A township-and-section description in a western state may need to be reconciled with the surface parcel and lease schedule used by a title system. Horizontal laterals can also cross or run beside multiple vertical well boundaries, so the mapped trajectory and final casing points matter.

Documents to retain

  • The final pooling or integration order
  • The application and attached proposed well plat
  • Exhibits listing ownership interests and acreage
  • Hearing notices, objections, and commission findings
  • Amendments, substitute-well approvals, or vacatur records

Keep the order, order exhibits, and well file together in one evidence record. It should show what the commission authorised, which interests were integrated, and whether the completed well matches the proposed or substitute well named in the decision. A spatial overlap without an identifier match should be marked as unresolved, not confirmed.

Verify ownership, exceptions, and legal effect

A shale map can show parcels, but it cannot establish every mineral, royalty, working, or surface interest. The owner named in an order may differ from the leaseholder, surface landowner, or party receiving production revenue. Confirm the chain of title, deed and lease records, royalty assignments, and any dispute or notice that could have affected the commission's decision.

Also test the exceptions. An order may exclude a tract, owner, depth interval, or proposed location; require payment before drilling; preserve a right to participate; or impose spacing and drilling conditions. Consent-based pooling may involve only some owners, while compulsory pooling supplies the disputed acreage. These distinctions can change the commercial position even when the same lateral is involved.

Use confidence labels such as confirmed, likely, or unresolved, and state the evidence behind each label. A final order naming the drilled well and affected legal descriptions is strong support. A lease map showing overlap is weaker and may justify only further inquiry. Because state statutes can limit standing or create appeal deadlines, relevant U.S. counsel should confirm legal conclusions before a transaction depends on them.

Adapt the process for Australian teams

Australian firms should translate the workflow into local recordkeeping without treating U.S. compulsory-pooling law as Australian law. This is particularly relevant to energy teams in Sydney and Melbourne working on U.S. shale, or in Perth and Brisbane comparing U.S. acreage with Australian assets. The same diligence applies when an Australian company considers U.S. shale alongside an LNG or east-coast gas investment.

Use familiar Australian business customs in internal trackers: record local valuations in A$, retain U.S. dollar values from the commission file, use DD/MM/YYYY dates, and show depths in metres and distances in kilometres without overwriting the source units. Include the relevant U.S. time zone when calculating notice or filing periods.

Australia's federal and state frameworks provide a useful analogy for checking jurisdiction before relying on a precedent. Local due diligence also requires care around native title and Indigenous Land Use Agreements, particularly when an Australian investor has wider agricultural, pastoral, or mineral interests. These checks complement rather than replace the U.S. commission record and help boards understand how a legal finding applies across the portfolio.

Move from mapping to verified intelligence

Repeat the review in a fixed order: identify the well and state; locate the application; obtain the final order; reconcile tracts and interests; test exceptions and amendments; then classify the evidence. Record the reviewer, retrieval date, source URL, and a short rationale for every conclusion so another analyst can reproduce the result.

A map is strongest when it joins legal and property evidence rather than substituting for it. Match completed wells to proposed or substitute wells, reconcile API numbers with lease schedules, and preserve screenshots or exported tables alongside commission documents. This creates a defensible chain from geographic candidate to supportable status.

Teams ready to run the workflow can begin with a seven-day free account, load the relevant state layers, and assign an owner to verify each candidate against the commission docket. Start with one operator and one shale county, document the identifiers connecting each order to a well, and expand the dataset once the evidence standard is agreed.



Welcome to ShaleNavigator
This online map application displays information specific to the leasing and development of shale plays in the United States, with particular focus on the Pennsylvania, Ohio, West Virgina, and New York's Marcellus and Utica shale leasing and drilling activity.

Data
Pipeline infrastructure, company land holdings, permit data, producing well data, and water impoundment sites provide base layers in the play, with other data layers our research team will continue to add and update regularly. Subscribers will be notified as new data are added. Our data is compiled from a variety of public and private sources for your use. We make every effort to review its quality. Contact us if you have high quality, relevant data and would like to become a data contributor.

Access ShaleNavigator
There is free registration to access ShaleNavigator's basic application and a resonably priced Subscription to access advanced data and map making, drawing, and sharing features.